Cities · King County

Can I build a backyard home in Redmond?

Since 2023, Washington law lets most city lots hold up to two more homes. Redmond writes its own rules on top. Here’s what the code says, in plain English — and a free report on what may fit on your lot.

Read from the Redmond code on October 1, 2026 · confidence medium · a summary, not legal advice. Rules change; the report re-reads them for your parcel.
The short version

What Redmond allows.

The headline standards. Open any card for the full wording and the code section.

ADUs per lot2 per lotFull wording

2 per lot — 'Two ADUs or tiny homes shall be allowed on each residential lot' (RZC 21.04.1110.C.1). NR zone also caps total dwelling units per lot at 6 (8 with one affordable unit), Table 21.08.200.B

Max size1,000 sq ftFull wording

1,000 sq ft — 'The total square footage of an ADU shall not exceed 1,000 square feet' (RZC 21.04.1110.C.3.a). Administrator may allow more on lots over 10,000 sq ft only if the unit is affordable or provides a public benefit (C.3.c). Accessory-structure footprint capped at 60 percent of the primary home's ground-floor living area excluding garage (RZC 21.04.1120.C.2.a). Whole-lot gross floor area cap in NR: 4,500 sq ft with 1 unit, 6,000 with 2, 7,500 with 3 (Table 21.08.200.C)

Max height38 ft (the NR zone maximum)Full wording

38 ft — accessory structures containing an ADU may go to the NR zone maximum of 38 ft (RZC 21.04.1120.C.1; Table 21.08.200.B); other accessory structures 22 ft

Front setback10 ft minimum in NRFull wording

10 ft minimum in NR (Table 21.08.300.A); accessory structures are prohibited within the front yard setback (RZC 21.04.1120.C.4)

Side setback3 ft interior side, 10 ft street side in NRFull wording

3 ft interior side, 10 ft street side in NR (Table 21.08.300.A); 5 ft minimum building separation

Rear setback5 ft in NRFull wording

5 ft in NR (Table 21.08.300.A); 2 ft from an alley; a detached ADU may sit on a lot line that abuts a public alley or right-of-way (RZC 21.04.1110.C.2.b)

Lot coverage50% of lot area (NR); impervious 70%Full wording

50 % of lot area for structures in NR (60 % only on lots of 18,000 sq ft or less with 3 or more units); maximum impervious surface 70 %; minimum open space 20 % (Table 21.08.200.B)

ParkingNoneFull wording

None — 0 spaces required for an accessory dwelling unit in every location category (Table 21.40.010D, Ord. 3261)

Where a city figure reads stricter than the state floor (RCW 36.70A.681), the floor may control — the report flags it for your parcel.

The rest

Living there, selling it, plans, time and fees.

Each answer is the code’s own wording, with the section it comes from. “Not published yet” means the city hasn’t posted a figure — the report asks the city, not the internet.

Are backyard homes allowed?

Yes — accessory dwelling units are a permitted use (P) in the NR, NMF, NMU, CMU, MME, DTE, DTC, TWNC, UR and RA-5 zones; attached or detached (RZC 21.04.0100 use table; RZC 21.04.1110.C.2)

Minimum lot size

None for an ADU — allowed on any residential lot; NR average minimum lot size for new lots is 3,000 sq ft (Table 21.08.200.B)

Do you have to live there?

No — no owner-occupancy requirement in RZC 21.04.1110 (removed; prohibited by RCW 36.70A.681 inside the UGA)

Can it be sold on its own?

Yes — no prohibition on separate ownership in the current RZC 21.04.1110 (the old 'shall not be segregated in ownership' clause is gone); RCW 36.70A.681 requires cities to allow ADU condominiums. Confirm the condominium process with the city and a title company

Pre-approved plans

None found — Redmond had no pre-approved ADU plan program on its website as of 2026-10-01; confirm with Planning

How long the city takes

Not published for ADUs; a detached ADU is a building permit through MyBuildingPermit with planning, tree and utility review. Confirm current turnaround with Development Services

Impact fees

2026 schedule (Ord. 3240) for a single-family detached unit: school $7,277.00 + fire $148.78 + parks $6,914.63 + transportation $10,107.51 = $24,447.92. No ADU line is published; RCW 36.70A.681 caps ADU impact fees at 50 percent of the principal unit, so plan on up to about $12,224 and confirm at permit. Water/sewer connection charges apply separately and depend on the connection

Your lot

The code is half the answer. Your parcel is the other half.

Lines and easements

Where the lot lines really are, which setbacks apply on each side, and whether a utility or access easement takes the corner you had in mind.

Critical areas and slope

Steep slopes, wetlands and streams come with buffers that no citywide number shows. The report reads the county’s maps for your parcel.

Sewer, septic, water, trees

Whether sewer reaches the lot or it’s on septic, where the water service is, and which trees a city protects — the things that decide where a unit can actually go.

Free, within a few hours, no obligation.
What Redmond allows, what could fit on your lot, and a planning cost range. If something won’t fit, the report says so — and shows what might.
Check my property, free →
Sources

Where this page comes from.

Read from the Redmond municipal code and the city’s own pages on October 1, 2026. The same table feeds the HousUp report, so the report and this page never disagree. Cities amend their codes; before you design anything, confirm the current wording with the city.

Find out what your property could become.

Type your address. Within a few hours: what Redmond allows, what could fit, and a planning cost range. Free, no obligation.

Check my property, free →How it works
Check my property, free →