Cities · Snohomish County

Can I build a backyard home in Marysville?

Since 2023, Washington law lets most city lots hold up to two more homes. Marysville writes its own rules on top. Here’s what the code says, in plain English — and a free report on what may fit on your lot.

Read from the Marysville code on September 15, 2026 · confidence medium · a summary, not legal advice. Rules change; the report re-reads them for your parcel.
The short version

What Marysville allows.

The headline standards. Open any card for the full wording and the code section.

ADUs per lot2 per single-family lotFull wording

2 per single-family lot

Max size1,000 sq ft or 50% of the residence, whichever is greater, capped at 1,400 sq ftFull wording

1,000 sq ft or 50% of the residence, whichever is greater, capped at 1,400 sq ft; minimum 200 sq ft

Max height30 ftFull wording

30 ft

Front setbackThe zone’s front setback (MMC 22C.010.080)Full wording

Per MMC 22C.010.080

Side setback5 ft (10 ft on a side street)Full wording

5 ft; side street 10 ft (15 ft on an arterial)

Rear setback15 ft (10 ft if one story)Full wording

15 ft; 10 ft if one story

Lot coverageThe zone’s coverage limit (MMC 22C.010.080)Full wording

Per MMC 22C.010.080

ParkingPer the middle-housing parking table (MMC 22C.130.030)Full wording

Per the middle-housing table at MMC 22C.130.030

Where a city figure reads stricter than the state floor (RCW 36.70A.681), the floor may control — the report flags it for your parcel.

The rest

Living there, selling it, plans, time and fees.

Each answer is the code’s own wording, with the section it comes from. “Not published yet” means the city hasn’t posted a figure — the report asks the city, not the internet.

Are backyard homes allowed?

Yes

Minimum lot size

The lot must meet the minimum for the principal unit

Do you have to live there?

No — none required

Can it be sold on its own?

Yes — state language adopted

Pre-approved plans

None found

How long the city takes

not published yet — ask the city

Impact fees

not published yet — ask the city

Your lot

The code is half the answer. Your parcel is the other half.

Lines and easements

Where the lot lines really are, which setbacks apply on each side, and whether a utility or access easement takes the corner you had in mind.

Critical areas and slope

Steep slopes, wetlands and streams come with buffers that no citywide number shows. The report reads the county’s maps for your parcel.

Sewer, septic, water, trees

Whether sewer reaches the lot or it’s on septic, where the water service is, and which trees a city protects — the things that decide where a unit can actually go.

Free, within a few hours, no obligation.
What Marysville allows, what could fit on your lot, and a planning cost range. If something won’t fit, the report says so — and shows what might.
Check my property, free →
Sources

Where this page comes from.

Read from the Marysville municipal code and the city’s own pages on September 15, 2026. The same table feeds the HousUp report, so the report and this page never disagree. Cities amend their codes; before you design anything, confirm the current wording with the city.

Find out what your property could become.

Type your address. Within a few hours: what Marysville allows, what could fit, and a planning cost range. Free, no obligation.

Check my property, free →How it works
Check my property, free →